We use cookies. We use cookies, including analytics, to improve your experience.
Casago SoCal, a DBA of Acme CA Vacations, Inc. · Michael Flannery · CA DRE #02439360.
Monterey · Carmel · Santa Cruz · Guide
Start from the number of nights the parcel may legally be rented, then make every assumption after that visible enough to argue with.
Existing owner? Access your Owner Portal
A projection is a set of assumptions with arithmetic on top. Around Monterey Bay the first assumption is not demand, price or occupancy — it is the legal night count, because the permit type here can cap it at three non-hosted rentals a year, restrict it to hosted use, or eliminate it entirely. A projection that starts anywhere else is decorative.
Before any rate appears, establish what the parcel may do. In the City of Monterey and in a Carmel-by-the-Sea residential district, the published answer is that a stay under 30 days is not allowed, so there is no short-stay projection to build. In the City of Santa Cruz, new permits are hosted only, which means the owner lives in the home for more than six months a year and the rentable calendar is a fraction of the year. A Monterey County Limited Vacation Rental licence permits up to three non-hosted rentals a year. A Commercial Vacation Rental licence there permits an unlimited number but additionally requires a Use Permit or a Coastal Development Permit.
Write that number down first, with its source and date, and treat it as the ceiling. Every subsequent line in the projection is a fraction of it. A projection that quietly assumes a full year of availability for a hosted permit is not optimistic; it is wrong.
A useful projection distinguishes four kinds of input. Facts about the property: bedrooms, legal occupancy, parking, condition. Facts about the permit: type, conditions, expiry, transferability. Assumptions the owner supplies: owner-use weeks, capital they will spend, how they weigh revenue against wear. Assumptions the manager supplies: seasonality shape, minimum stays, cleaning and turnover cost, maintenance reserve.
The fourth category is where projections go wrong, because it is the one presented as if it were the first. Every manager assumption should be labelled as an assumption, stated in plain language, and open to challenge. If a number cannot be traced to either a fact or a stated assumption, it should not be in the document.
Seasonality here deserves its own line. Visit Santa Cruz County calls fall the season with the best weather rather than summer, and See Monterey describes a consistently mild climate with an average temperature of 60 °F. A projection shaped like a hot-coast summer peak is describing a different market.
Cleaning and turnover cost more at a surf address than a projection template assumes, because sand and wet gear arrive with every guest. Maintenance reserve should reflect what the City of Monterey’s own page describes: foggy days and high water tables contributing to excess environmental moisture, with mold present indoors and outdoors all year round. Salt corrosion near the water shortens the replacement interval on hardware, fixtures and outdoor furniture.
Add the compliance line items that actually exist for the parcel. Pacific Grove states an application fee of $141 with a further $124 on approval, a renewal fee of $221, and a current transient occupancy tax rate of 12%. Santa Cruz County gives an annual short-term rental permit fee of $145. Those are the figures read on those pages on 2026-09-20; other fees were not read and are not asserted here. Confirm current amounts with the authority before relying on any of them.
No one can promise an occupancy rate, an average daily rate, a revenue figure or a ranking. This site publishes none of them, and a market-level average across two counties, five cities and three permit types would not describe any individual home. Nor can anyone promise that a permit will be issued, that a cap will have room, that a block-density screen will pass, or that a coastal-zone question will resolve a particular way.
What can be promised is method: a projection whose ceiling is the legal night count, whose assumptions are labelled, whose costs reflect this coast, and which is revised when the facts change. If a projection you are shown does not identify the jurisdiction and permit type on its first page, that is the question to ask before any of the numbers.
Because on this coast it varies from zero to unlimited. A Carmel-by-the-Sea residential parcel has no short-stay path. A City of Santa Cruz hosted permit assumes the owner lives there more than six months a year. A Monterey County Limited Vacation Rental licence allows three non-hosted rentals a year. A projection built on a full rentable year would be wrong in all three cases.
Only those read on the authority’s own page on 2026-09-20 and quoted with attribution: Pacific Grove’s $141 application, $124 on approval, $221 renewal and 12% TOT rate, and Santa Cruz County’s $145 annual permit fee. No other fee amount was read, so none is asserted. Confirm current amounts with the authority.
Not on this page, and not as a market average. Those numbers are property-specific and they move. Continue to the Owner Portal for a property-specific conversation, where the assumptions behind any figure can be shown and challenged.
Which jurisdiction and permit type it assumes, what legal night count it starts from, which lines are facts and which are assumptions, what cleaning and maintenance cost it uses for a damp, sandy coast, and what happens to the result if the permit turns out to be hosted rather than non-hosted.
Next step
Continue to the Owner Portal for a property-specific conversation. Prospective owners choose I'm considering the program. Existing owners sign in as an owner. Nothing about your home is sent from this page.